Heat Treatment
Heat treatment is arguably the most critical step in gear manufacturing, and this is the reason Mesh Gear has decided to have full control over the process.
This process is carefully controlled in-house using the carbomat system and verified in our metallurgical laboratory.
2 Gas Carburising Furnaces
– Max. Diameter: 800mm
– Max Length: 800mm
– Controlled by Carbomat System
Gas Nitriding Furnaces
MAX. Diameter: 880mm
MAX. Length: 1000mm
Bevel Gear Heat Treatment
– Quenching Press
Metallurgical load sample inspection is performed in our in-house laboratory to guarantee your metallurgical requirements are met.
Additional facilities:
Conditioning, Normalising & Annealing.
Induction Hardening
Get In Touch
Email us:
trevor@meshgear.co.za
steven@meshgear.co.za
Telephone: (+27) 31 461 1121
Fax: (+27) 31 468 6898